Design Qualification
Test fixtures for design validation.
Not throwaway bench rigs — qualification infrastructure that becomes your production fixture.
Engineering qualification is where institutional knowledge goes to die.
Your team builds test rigs for DVT. They work — for engineers, on good days, on the right bench. Then the design goes to production and none of it transfers. Production rebuilds from scratch. Test limits get guessed. The yield problems you solved in DVT show up again on the line.
Qualification infrastructure that survives the handoff.
FixtureOps Qualify fixtures run on the same stack as your production test system from day one. The characterization data you collect during EVT flows directly into your production fixture configuration. When you release to manufacturing, we deliver a throughput-optimized derivative — not a rebuild. Your test limits are derived from real data. Your production fixture is ready before your first unit ships.
EVT → production continuity
Same fixture stack from first characterization run to volume production. No rebuild at handoff.
Data-derived test limits
Characterization data collected during DVT sets your production pass/fail thresholds — not engineering estimates.
Throughput-optimized derivative
Production fixture is engineered from the qualification fixture. Operator-proof, cycle-time optimized.
Connected from day one
FixtureOps platform visibility during qualification and production — yield data, diagnostics, remote support.
Tell us about your design.
Every qualification program is different. Let's talk through your board, your test requirements, and your production timeline.
Talk to us about DVT fixtures