Modernize Existing Fixtures

Fixtures on the floor. Finally visible.

Yield data, remote support, and managed lifecycle — without replacing what you have.

Your fixtures are on the floor. But they're invisible to operations.

No yield data. No remote diagnostics. No way to know when something is drifting until a batch fails. Every service call is a surprise. Every firmware update is a site visit. And when a fixture goes down mid-shift, you find out from the line — not from a dashboard.

Connect the fixtures you have.

The FixtureOps Gateway connects to your existing test hardware. You get a live dashboard with FPY and Cpk, fault diagnosis that surfaces root causes before they stop the line, OTA firmware delivery, and remote support through controlled SSH-based access paths, where customer policy permits. Most vendors stop at delivery. INTenX keeps the fixtures running.

Real-time yield visibility

FPY, Cpk, and fault frequency on a live dashboard. Ops sees what engineering sees.

Faster fault diagnosis

Pattern recognition that surfaces probable root causes and repair guidance before faults become line stoppages.

OTA firmware delivery

Recipe updates and firmware changes pushed remotely. No site visit, no manual process.

Remote support

Audited SSH tunnel gives INTenX engineers secure access to diagnose and resolve issues without travel.

Four retrofit paths.

Not every modernization is the same. The right scope depends on your fixtures, your constraints, and what you need to run reliably.

Read-Only Connectivity

Telemetry, dashboards, alerting. No changes to core test logic. Fastest to deploy.

Supportability Retrofit

Remote support tunnel, structured diagnostics, controlled update paths.

Control-Layer Modernization

Replace fragile PC/HMI/PLC orchestration while preserving fixture mechanics.

Fixture Estate Standardization

Bring multiple legacy fixtures onto a common architecture and support model.

Get a rough estimate.

Answer seven questions. We'll give you a ROM range — or tell you when a scoping conversation makes more sense.

Step 1 of 7

What do you want to improve?

Want to see what a full Readiness Report looks like?

Download a sample assessment →